more products
News
Products
Featured Products
Contact Details
First container loading in September
04-09-2021
In the morning of Sept.3nd,2021, Guangzhou Print Area’s colleagues came to the company early and were ready to load two specifications. At 9 o'clock, the colleagues officially began to load 40-feet container, and according to the plan, each pallet of the goods was moved into the container one by one. The second container will be load at 10 o'clock. Due to the advance preparation this time, the two containers were completed in one and a half hour.
The goods this time mainly include jelly glue, adhesive glue, BOPP film, double wire, etc. If necessary, please consult us.
<img src="https://img.waimaoniu.net/2525/2525-202108271609111507.jpg" style="width: 800px;" width="800" border="0" vspace="0" title="Double Wire""/>
Get the latest price? We'll respond as soon as possible(within 12 hours)